As part of the 2000 Comprehensive Plan Update, Lower Gwynedd Township adopted a Master Plan for improvements to Bethlehem Pike. The plans were adopted after numerous public meetings. The Bethlehem Pike Improvement Plans propose the development of a walkable town center for the Spring House area, which is defined as Bethlehem Pike from Chesterfield Drive south to Dager Road.
Improvements Gallery |
|
Before Images

|
|
After Images


|
The improvements include the installation of sidewalks, uniform split rail fencing and daylily plantings. Plans also include street trees and street lighting. The major change proposed is the creation of a median in the section of Bethlehem Pike from Rotelle Drive south to Sheblee Lane. The median would allow for dedicated left turn lanes and would require common driveways among some businesses. Two additional traffic signals are also proposed. The first would be located at Rotelle Drive and the second at Sheble Lane.
The plans have been divided into three phases. Phase I consists of the area from Chesterfield Drive south to Rotelle Drive. Phase II is the area south of Rotelle Drive to Sheble Lane and Phase III is from Sheble Lane south to Dager Road.
Phase I plans have been engineered and the Township is preparing to bid the improvements. Phase I does NOT include the installation of the traffic signal.
The Bethlehem Pike Improvement Plans are a high priority for the Board of Supervisors and important to the Township's overall planning goals.
Bethlehem Pike Improvement Project Flyer
Click on the link above to receive the informational flyer that the Township has made and distributed for local businesses to post for their customers.
Frequently Asked Questions
Do you have questions? Maybe we already have the answers. Click on the link above to find out more about the Improvement Project.